VCC-LogoVCC-LogoVCC-LogoVCC-Logo
  • HOME
  • COMPANY
  • SERVICES
  • PROJECTS
  • SAFETY PROGRAM
  • CAREERS
  • NEWS
  • CONTACT
FONTAINEBLEAU AVIATION
April 8, 2021
El Dorado Furniture
March 31, 2021

ESPERANTE CORPORATE CENTER

  • Located in Downtown West Palm Beach
  • Cast-in-place concrete work for Kaufman-Lynn Construction
  • Four pile caps, each supporting a 5′-00″ x 2′-06″ x 33′-00” tall cast-in-place concrete column for the porte-cochère roof
  • Each column was cast with (36) 1 3/8″ diameter through bolts near the top of the column
  • Zero tolerance for the placement of the anchor bolts which were to receive a5′ x 5′ x 3″ thick steel plate on each side of the column
  • Cast-in-place retaining walls and architectural concrete stairs



© Victory Concrete Contractors, Inc. | 561-227-9577 | Powered by Amaniac Design